diewolke.app
|||
Laden im App Store
← All competitions
⚠ This page has been automatically translated by AI. The original content is in German.
Contract awardedThis competition is closed.
Full details on simap.ch
Project study·Bern

Extension of Bellmund School

Zuschlag an 4 Teilnehmende
Balmer Architektur GmbHLangnau i.E., BE
chf 24'863
MJ2B Architekten AGBern, BE
chf 24'863
Naos Architekten AGBern, BE
chf 24'863
Oxid Architektur GmbHZürich, ZH
chf 24'863
Publication date
05.05.2026
Description

The municipality of Bellmund plans an expansion of the school complex and has launched a design competition following the selective procedure according to SIA 143. The objective is to expand the spatial offering of the school building through a complementary new construction and to optimize the existing spatial offering in order to implement Curriculum 21 and ensure sustainable school operations. This means creating flexible, multifunctional learning spaces, incorporating the outdoor area. This area stands out for its unique location with views of the Alps and Lake Biel. The school complex consists of a main building from 1972, a renovated farmhouse, a gymnasium, and other secondary buildings that are not directly affected by the planning. An extension of the main building is not possible due to current building regulations. This tender is based on a space concept developed by the directly affected parties and a resulting strategic report on school space planning. This is intended to enable Bellmund School to develop its own profile and identity. The design competition includes the development of a comprehensive concept. It includes the adaptation and renovation of the existing school complex (approximately 2,400 m²) as well as the new construction of approximately 1,500 m² of school space. Pre-qualification is carried out by submitting application documents, which must include references and a letter of motivation. Five planning teams will be selected for the design competition and will receive a flat fee of CHF 23,000 (excluding VAT). The design competition is conducted in several phases, including a kick-off meeting, an intermediate meeting, and the final submission of project documents. Evaluation is based on criteria such as architecture, use, feasibility, cost-effectiveness, and sustainability. The result of the procedure serves as the basis for a funding request to the population and the award of planning services to the winning team. Conformity: SIA 143

Contact awarding authority
Documents

Finde und bilde jetzt dein Team

Schnell und verbindlich zum Wettbewerb.

Laden im App Store
Per E-Mail teilen
Client
Gemeinde Bellmund
Location & Canton
Bellmund, Bern
Procedure
Selektiv
Discipline
Structural engineering
Project number
15927
Publication number
15927-04

Related Competitions

Project study
Studienauftrag Schulraumerweiterung Hofwies, Appenzell
Appenzell Inner Rhoden · Deadline 03.10.2025
Project study
Studienauftrag Erneuerung und Erweiterung Schulanlage Stadelfeld Wichtrach
Bern · Deadline 10.03.2025
Project study
Schulraumerweiterung Rietwise
Aargau · Deadline 06.11.2025
Project study
Sanierung und Erweiterung Schulanlage Mühlethurnen
Bern · Deadline 26.06.2025