N09.48 MP-080010 - Upn.Vennes-Chexbres - Environmental monitoring of implementation (EMI) TP2 (ID 11792)
ASTRA - Branch office Estavayer-le-Lac ASTRA, Head office Ittigen At the office of the clients On the network section of the affected national road At the territorial unit of the affected national road At the cantonal authorities At the affected municipalities.
The engineering assignment in question concerns environmental monitoring services between SIA phases 41 and 53 for two construction sections: - Installation of a system for drainage and treatment of roadway water - Renovation of vaults; - Maintenance and expansion of the Vennes junction; These works take place in the partial section TP2 (km 07,540 to 11,800) as part of the UPlaNS N09 Vennes – Chexbres project. These services mainly include: - General services (support and technical advice, specific training, periodic reports, participation in meetings etc.) - Summary of environmental requirements, measures plan - Services for the tender phases (preparation of environmental documents, review of bids etc.) - Detailed design: support to the client and the project designer - Environmental monitoring during construction execution - Environmental handover of the works - Services for the commissioning phase (final report etc.) - Monitoring of the effectiveness of environmental measures over a period of 5 years after completion of construction work.