diewolke.app
|||
Laden im App Store
← All competitions
⚠ This page has been automatically translated by AI. The original content is in French.
service

N05.80 MP-220010 - EM Bözingenfeld - Lengnau - Building Project Manager (ID 11878) Phase MK / AP - IBN / Completion

Publication date
12.05.2026
Submission deadline
10.07.2026
Execution start
01.10.2026
Location

On-site services (such as meetings) are provided on-site at the FEDRO Infrastructure office in Thun, the central office in Ittigen or the visitor center Wankdorf as well as in the project perimeter. Services that are not location-bound are provided by the contractor.

Description

The project perimeter is located in the national road section N05.80, Bözingenfeld – Lengnau and comprises the section from the Bözingenfeld junction to the structure BS 20 Leugene Bridge, from km 73.965 to km 81.195. This corresponds to a length of km 7.23. The section of the N16 between the Bözingenfeld junction and the D01 Pont sur T5 bridge is part of the maintenance section N05.80. This road section was mostly constructed between 1998 and 2000 and put into operation in 2001. The UNF BS 03 Bözingenfeld N16 was completed in 2020. It is the national road N05, class 1, which is owned by the FEDRO. The project perimeter contains 8 overpasses, 4 underpasses, 4 culverts, 1 basin, 6 retaining walls, 1 tunnel, 5 noise protection embankments, 5 noise barriers, 2 oil retention basins, 2 pump shafts and 20 signal gantries. The renovation includes the following works: resurfacing on the entire section, reconstruction of the 4 retention basins, various concrete repairs on structures and in the Pieterlen tunnel, local reinforcements of signal supports, various waterproofing treatments on structures, replacement of the surface protection system in the Pieterlen tunnel, markings, signage and lighting on the entire section. The Biel East / Bözingenfeld junction, which is classified as an accident hotspot and is located in the Bözingenfeld development priority area, must be reviewed from a traffic engineering perspective. At present, it is assumed that structural measures will be required. This procurement contains the mandate of construction project manager for the phases MK / AP with PGV (procedure support, handling of objections) until realization / IBN (Optional) using the BIM planning method.

Contact awarding authority
Documents

Finde und bilde jetzt dein Team

Schnell und verbindlich zum Wettbewerb.

Laden im App Store
Per E-Mail teilen
Client
Bundesamt für Strassen ASTRA - Abteilung Strasseninfrastruktur West - Filiale Thun
Procedure
Offen
Execution
01.10.2026 – 28.02.2035
Consortium
Permitted
Subcontractor
Yes
Project number
36888
Publication number
36888-01
Task type
service

Related Competitions

service
N05.80 MP-220010 - EM Bözingenfeld - Lengnau - Projektverfasser BSA - Phase MK / AP - IBN / Abschluss (ID 11911)
Deadline 10.07.2026
service
N08.52 MP-080293 - EP Spiez - Interlaken West - PV Bau/BSA und Verkehr, inkl. BL - Phase MP/DP - Inb./Abschluss (ID 11584)
service
N06.24 MP-190010- NEB EP Brüggmoos - Lyss Süd - Projektverfasser Bau für die Phasen EK/GP, MK/AP und PGV (ID 11406)
service
N06.44 MP-250007 - NEB EP Spiez - Kandersteg - Projektverfasser Bau - Phase EK (ID 11614)