N06.44 MP-250007 - NEB EP Spiez - Kandersteg - Traffic Planner - Phase EK to 53 (ID 11784)
For the national road section N06.44/48 Spiez – Kandersteg, which was transferred to the federal government in 2020, a maintenance project is planned. The 23.9 km long stretch includes, in addition to the alignment, two tunnels (Spiezwiler and Mitholz) and numerous structures. Due to the cantonal nature of the route, slow traffic and tourist considerations are important aspects to be included. The project starts in 2026 with the EK phase (global maintenance concept). The main purpose of this call for tender is to procure a traffic planner from the EK phase through to the execution of works in the project perimeter and their completion (EK to 53). The project perimeter is located in the following two maintenance sections - N06.44: km 39.6 to 52.4 – Spiez to Frutigen - N06.48: km 52.4 to 63.5 – Frutigen to Kandersteg In section 44, the traffic planner assumes the superordinate role. In section 48, intensive coordination with the superordinate traffic planner of the NEB Kandergrund Mitholz Bypass project must be ensured.