Contract awardedThis competition is closed.
Full details on simap.ch
service

N02, Second Tube San Gotthard (2TG Tube North and Galleria di Airolo) and N02 Renovation First Tube San Gotthard (1TG Tube South), BSA Lot 1303 – Support High Voltage Protection

Zuschlag an
BKW Energie AG
Viktoriaplatz 2, 3013 Bern
chf 773'114.96
Publication date
30.06.2026
Description

To enable the renovation of the existing Gotthard road tunnel – approximately 17 km long – the Federal Council, Parliament and the population have decided to build a second tube. The BSA equipment of the second tube, referred to as Tube North, will be installed between 2027 and 2030, partially in parallel with the completion of construction works. In parallel with the North Tube, the Galleria di Airolo (GdA) with a length of approximately 1 km will also be constructed, forming an integral part of the Gotthard system. Immediately after the opening of Tube North in contraflow operation, the renovation of the existing tube, referred to as Tube South, will be undertaken. The structural renovation is scheduled for 2030 to 2033. The existing BSA equipment of Tube South will be completely dismantled due to its age. The new BSA equipment will be installed partly in parallel with traffic operation and is expected to last until 2036. In its final state, the GTG will be operated in directional traffic (one lane per tube plus emergency lane) at a speed of 80 km/h. However, closure of one tube will occur regularly for maintenance and operational reasons. This lot comprises support to ensure coordinated medium and high voltage protection across all voltage levels and construction phases.

Contact awarding authority
Bundesamt für Strassen ASTRA - Abteilung Strasseninfrastruktur-Ost - F3 ZofingenBrühlstrasse 3, 4800beschaffung.zofingen@astra.admin.ch+41584827511
Documents

Finde und bilde jetzt dein Team

Schnell und verbindlich zum Wettbewerb.

Laden im App Store
Per E-Mail teilen
Client
Bundesamt für Strassen ASTRA - Abteilung Strasseninfrastruktur-Ost - F3 Zofingen
Procedure
Offen
Project number
34627
Publication number
34627-02
Task type
service

Projektverlauf

tender07.04.2026

N02, Secondo tubo San Gottardo (2TG Röhre Nord und Galleria di Airolo) und N02 Risanamento primo tubo San Gottardo (1TG Röhre Süd), BSA-Los 1303 – Support Schutz Hochspannung

Um die Sanierung des bestehenden - rund 17 km langen - Gotthard Strassentunnels zu ermöglichen, haben sich Bundesrat, Parlament und Bevölkerung für den Bau eine

Related Competitions

service
MP-120043 N02 Secondo tubo San Gottardo (2TG Röhre Nord) / PV BSA GdA; PV und ÖBL - Nachtrag
service
N2 Secondo tubo San Gottardo (2TG) - Ingenieurleistungen BSA (PV BSA FB3, inkl. öBL; Lüftungsanlage GTG und Galleria di Airolo)
service
N02 Second Tunnel San Gotthard (2TG North Tunnel) - PV BSA FB8: Addendum No. 1
service
MP-250027 N2 Risanamento primo tubo San Gottardo (1TG) – Projektverfasser Bau für die Phase Massnahmenprojekt