diewolke.app
|||
Laden im App Store
← All competitions
⚠ This page has been automatically translated by AI. The original content is in French.
service

N08.64 MP-080145 - Brünig Gnoll - Wacht Curve - Site Management Construction (Phases 41, 52 and 53) (ID 11856)

Publication date
14.04.2026
Submission deadline
05.06.2026
Execution start
01.09.2026
Location

N08, construction site area Gnoll – Wacht Curve (site office), offices of the contractor as well as ASTRA Infrastructure branch in Thun or headquarters in Ittigen (meetings).

Description

The expansion and maintenance project «Brünig Gnoll – Wacht Curve» adapts and expands the Brünig Pass road (NS 3rd class) between the junction with Meiringen road (Gnoll) and before the Wacht curve to current standards and requirements. The main component is a continuous road widening with mountain-side retaining walls and valley-side cantilever slab structures. Additionally, the guardrails, drainage system and BSA facility (pipe block) are replaced and the entire road body is renewed. For the execution and traffic management, a temporary auxiliary bridge is constructed. The construction period lasts approximately 4-5 years. The advertised contract includes site management construction in the following phases: Assistance with the tender procedure (Phase 41); site management (Phase 52); and assistance with commissioning and project completion (Phase 53). The mandate requires close coordination with the construction project designer and the chief site manager.

Contact awarding authority
Documents

Finde und bilde jetzt dein Team

Schnell und verbindlich zum Wettbewerb.

Laden im App Store
Per E-Mail teilen
Client
Bundesamt für Strassen ASTRA - Abteilung Strasseninfrastruktur West - Filiale Thun
Procedure
Offen
Execution
01.09.2026 – 31.12.2034
Consortium
Permitted
Subcontractor
Yes
Project number
35129
Publication number
35129-01
Task type
service

Related Competitions

service
N08.64 MP-080145 - Brünig Gnoll - Kurve Wacht - Externe Oberbauleitung Bau für die SIA-Phasen 41 bis 53 (ID 9695)
service
N08.64 MP-080145 - Brünig Gnoll - Kurve Wacht - Projektverfasser Phase DP - 53 inkl. öBL - Nachtrag 04 - ID 11959
service
MP-110042, N08/68 Vollanschluss Alpnach Süd Bauingenieurleistungen als GL, SIA-Phasen 41-53
service
MP-090080 EP Sarnen Süd – Hergiswil Bauherrenunterstützung Bau/BSA Phasen 31 bis 53