N01.16 MP-150024 - EM Kerzers - Bethlehem - Project Engineer BSA and Ventilation, incl. öBL - Phase MK to 53 (ID 11942)
Non-site-dependent services are to be provided at the contractor's location; site-dependent services are to be provided on-site within the project perimeter as well as at ASTRA infrastructure branch in Thun, office premises in Visp or headquarters in Ittigen (meetings).
The national road section N01.16 from Kerzers to Bethlehem is being upgraded as part of individual measures. The total length of the project perimeter is 14.95 km and is divided into two sub-projects. - EM «Tunnel Brünnen», incl. slow traffic routing connection Brünnen Main measures: renovation of Tunnel Brünnen, incl. new construction or expansion of central facilities, replacement of fire water pipeline and complete replacement of BSA including drainage. Review of slow traffic routing Riedbach-/Niederbottigenstrasse - EM «UeMa open section, incl. noise» Main measures: wearing course replacement, partial drainage renovation, noise protection measures and upgrading of individual structures This procurement comprises the mandate of project engineer BSA and ventilation for the BSA specialist field as well as site supervision for the phases MK/AP to SIA-Phase 53 commissioning/completion