MP-090080 EP Sarnen South – Hergiswil Project Manager (PM) Wildlife Corridor (WC) in Phases 31 - 53
- At ASTRA, Zofingen branch - At the clients' office - On the network section of the affected national road
On national road N08 between Sarnen South and Hergiswil, traffic safety deficits predominantly exist. Furthermore, wildlife passage between the two sides of the valley is severely hampered by various obstacles. The objective of this maintenance project is to increase traffic safety with a planning horizon for 2040, low-maintenance operation over the next 15 years, as well as the promotion of wildlife passage. The objectives are to be achieved through rehabilitation and replacement of the road surface (pavement, FZRS, drainage, etc.), structures (wildlife corridor, bridges, underpasses, etc.) as well as operational and safety equipment (GHGW, ramp metering, piping systems, etc.). Furthermore, the ASTRA archives for the entire perimeter are to be digitalized and structured. The subject of the tender is design services as Project Manager for Wildlife Corridor in the phases Executive Project (EP) through commissioning. From the Detailed Design (DD) phase onwards, the BIM method must be applied.