The Roof of a World, Major Renovation of a Care Home in Echallens
The electrical engineer's mandate aims to ensure electrical installations that comply with regulatory requirements and are adapted to a care home undergoing major renovation with the objective of Minergie ECO excellence or equivalent, taking into account the constraints of the existing structure. It covers the design, dimensioning and integration of high-voltage and low-voltage systems, taking into account the specific operational requirements of a healthcare facility (safety, service continuity, patient call systems, etc.). The mandated party supports the design, execution and verification of installations with a focus on energy optimization, reliability and cost control. The ultimate objective is to ensure safe and sustainable operation of the building, guaranteeing the comfort, safety and quality of care for residents and staff.