Feed-in S10: Main line, specialized planning civil engineering and cables SIA phases 41 - 53
Zurich. Location-dependent services (e.g. meetings, site inspections, surveys) are performed at the client or on-site. Non-location-dependent services are performed at the contractor's premises.
The SZU wishes to realize, according to the catering concept of the SBB East Region, a power switching station (LSP) as an indoor facility in a room on the 2nd basement level of a residential development currently under construction. The connection of the Zurich SBB substation (UW) is established via a new cable installation from the UW to the new LSP. The project is divided into two parts: Part A: Design of the cable routing from UW to LSP and Part B: Design of the LSP. The subject of this procurement is the overall project management for both project parts A and B, as well as the specialist planning of Part A (civil engineering and cables) for phases 41-53, whereby the incorporation of requirements from the decree in the respective phases must also be integrated. Further details can be found in document B1 "Specifications Technical Specification". The specialist planning of Part B will be awarded separately and must be coordinated by the overall project management. Please refer to document A1_SZU_Procedural Regulations and B1_Specifications_techn_Spec for further information.
Anticipated (according to current planning).